The purpose of this project is to reconfigure from 4 through lanes to 2 through lanes with bike lanes, and one 2-way left turn lane on Petaluma Blvd. South from E street to Crystal Lane (Roundabout) to provide adequately sized driving lanes. This will improve safety for all modes of transportation and encourage more bicycle and pedestrian use.
Road Diet Extension Petaluma Blvd South
Posted on December 28, 2021