Address:
The tertiary system exceeds its capacity during high demand periods. This project expands the capacity of the system used to treat wastewater effluent to produce up to 6.8 MGD of tertiary recycled water. To provide additional recycled water treatment capacity, the City will add pumping capacity, two cloth media filters and add a third ultraviolet (UV) light system in an existing channel constructed for this purpose.