The proposed contractor estimates that 5 to 7 round trips will be made per day during the first 5 days of the operations. During the second week, this number will taper down to 3 to 4 round trips per day.
For more information on the Turning Basin Dredging & Dock Restoration (2022), CLICK HERE.