Will the project change water runoff or surface water drainage patterns? Will the project cause erosion, or siltation during construction?

No, this project will not change the way water drains from the site. There will only be minimal disturbance to soil during construction. Drainage patterns at the project site would remain essentially the same as they currently exist. The project would result in only a minor increase in impermeable surfaces associated with the well treatment shed (approximately 250 square feet) and the well vault. Construction and operation of the project would not substantially alter drainage patterns or increase runoff, and erosion or siltation is not anticipated.