Search Results

Filters

641 Results Found

Matched in attachment: "... IMPORTANT INFORMATION ABOUT YOUR DRINKING WATER SERVICE LINES Este informe contiene información muy ... WAIT - You can wait for the City of Petaluma to inspect your line. ... Lead exposure can cause new learning and behavior problems or exacerbate existing learning and behavior ... problems. ... Adults can have increased risks of heart disease, high blood pressure, kidney or nervous system problems ..."

HAGA CLIC AQUÍ PARA ESPAÑOL

Matched in attachment: "... CONTRACTOR SHALL PROVIDE & PAY ALL NECESSARY FEES & PERMITS WITH THE CITY OF PETALUMA, CA. ... NOTIFY PROJECT LANDSCAPE ARCHITECT IN WRITING OF ANY PROBLEMS PRIOR TO CONSTRUCTION. 2. ... ALL FENCE, GATE HINGES AND LATCHES TO CONFORM TO THE CITY OF PETALUMA POOL/ SPA/ HOT TUB REQUIREMENTS ... SHOWN AS "TO BE REMOVED" ARE NOTED BASED ON ASSUMED BUILDING IMPACT OR OTHERWISE NOTED IN THE ARBORIST REPORT ... OR ALL TREE REMOVALS PER CITY GUIDELINES. ..."

Matched in attachment: "... Those environmental reports or drawings relating to Asbestos, Hazardous Waste, PCBs, Petroleum, and ... , if said reports and drawings are not bound herein. ... The CITY makes no representation as to the completeness of the reports or drawings referred to in Paragraph ... costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of reports of physical conditions ..."

Matched in attachment: "... RECOMMENDATION It is recommended that the City Council receive the report and provide direction ... As a result, the community can reach staff by email, find information and report problems on our website ... problems online. ... For instance, the City’s financial accounting and reporting, land development permitting, city council ... A separate report of the survey results was submitted to the City on September 24, 2019. ..."

Matched in attachment: "... reports. ... Should new information come to our attention that indicates a water quality problem with this Project ... LIMITATIONS This report has been prepared by RGH for the exclusive use of the City of Petaluma and ... ---------------------------------------------------------------- Problem ... - The City of Petaluma. ..."

Matched in attachment: "... This report will  assist the City of Petaluma, its City Council, department heads, program directors, ... This report will assist the City of Petaluma, its  City Council, department heads, program directors, ... problems encountered by persons with disabilities.  ... Services to the Public  The City Attorney’s office reports to the City Council and serves the public ... The problem is ongoing, and  not a one‐time event.   ..."

Matched in attachment: "... Drought can also cause public health problems related to poor water quality, and health problems can ... In addition to damage to area infrastructure and City facilities, other problems associated with flooding ... The City of Petaluma’s latest CIS report, released July 10, 2019, shows 30 Repetitive Loss buildings ... The San Francisco Tide Gauge located north of Chrissy Field in the City of San Francisco reports the ... Figure 4-46 below shows the number of incidents within the City limits reported to Cal OES over the ..."

Matched in attachment: "... , if said reports and drawings are not bound herein. ... The CITY makes no representation as to the completeness of the reports or drawings referred to in Paragraph ... costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of reports of physical conditions ... If the CONTRACTOR fails to provide the City with an acceptable “Record Drawings”, the City shall deduct ..."

Matched in attachment: "... dramirez Typewriter 18 Page 3 of 3 LIVING WAGE ACKNOWLEDGEMENT and CERTIFICATION May 2020 REPORT ... “Stated Rate” means a rate per annum equal to the lesser of (a) the “prime rate” (as reported in The ... , design drawings, environmental reports, sampling results or other documents relating to Hazardous ... Purchaser shall timely report, make filings for, and pay any and all sales, use, income, gross receipts ... Provide Maintenance report including work performed, results, findings and images. b. ..."

Matched in attachment: "... PETALUMA FIRE DEPARTMENT FIRE PREVENTION DIVISION POLICIES AND STANDARDS Special Event – Propane ... 94952 (707) 778-4389 | [email protected] PURPOSE: This policy is a summary of Fire Department ... interpretations of City and State Codes, and Industrial Standards. ... mailto:[email protected] PETALUMA FIRE DEPARTMENT FIRE PREVENTION DIVISION POLICIES ... Some of the common problems encountered during the Fire Department’s on-site inspection which can result ..."

Matched in attachment: "... EDR’s City Directory Report includes a search of available city directory data at 5 year intervals. ... The purchaser of this EDR City Directory Report may include it in report(s) delivered to a customer. ... EDR’s City Directory Report includes a search of available city directory data at 5 year intervals. ... The purchaser of this EDR City Directory Report may include it in report(s) delivered to a customer. ... It is dynamic to the extent that it is modified as new problems are identified and existing problems ..."

Matched in attachment: "... ACTIVITY REPORT MARCH – SEPTEMBER 2024 Page 1 FACILITIES & PROPERTY MANAGEMENT Overall facilities ... OSHA standards for fall hazards, access, and electrical safety compliance, replacing pumps to meet City ... • Completed the transition of the electric sign from DAA to the City which included repairing a ... • Negotiated city sponsorship of the event. ... MARCH – SEPTEMBER 2024 Page 8 Repaired electric sign and transitioned programing to city ..."

Matched in attachment: "... As a result, existing land use compatibility problems in these areas would be less likely to be resolved ... However, fewer existing land use compatibility problems would be remedied. ... , a City department, another public agency, etc.); (2) the "type of monitoring action" required (e.g ... program-wide mitigation measures at an early time when the agency has greater flexibility to deal with basic problems ... The City of Petaluma is preparing an environmental impact report (BIR) for the Draft Central Petaluma ..."

Matched in attachment: "... Page 1 of 3 CITY OF PETALUMA CLASS SPECIFICATION Date: 6/21/2021 Job Class: 03ATRF Assistant ... the latter is a registered engineering position with overall administrative responsibility for the City's ... requests for traffic control changes; prepare necessary correspondence; conduct studies and prepare reports ... Skills/Abilities: Apply engineering principles and techniques to the solution of traffic engineering problems ... Prepare clear, concise, and accurate reports, records, and correspondence and other written materials ..."

Matched in attachment: "... Those environmental reports or drawings relating to Asbestos, Hazardous Waste, PCBs, Petroleum, and ... , if said reports and drawings are not bound herein. ... The CITY makes no representation as to the completeness of the reports or drawings referred to in Paragraph ... costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of reports of physical conditions ..."

Matched in attachment: "... The SGMP should be submitted to the City of  Petaluma (City) for review and approval prior to the City ...  for review and approval prior to the City issuing building permits  for the Site.  ...  for review and approval prior to the City issuing  occupancy permits for the Site ...    If the City does not have staff with the necessary experience/expertise to review and  approve the ...  SGMP and VIMS related designs/documents described above, the City  should hire a third party qualified ..."

890 Co-Op Environmental Site Assessment_submitted 10-18-2021

Matched in attachment: "... Alternative Mitigation Measures per Category Prevention Preventive measures are designed to keep the problem ... These measures are popular with many because they "stop" flooding problems. ... City of Petaluma HMPC Meeting #3 • City of Petaluma, Public Works and Utilities Department – Diane ... INFRASTRUCTRE PROJECTS Acquisition of hazard prone structures ■ ■ ■ ■ Facility inspections/reporting ... (Does it solve the problem? Is it feasible?) ..."

Matched in attachment: "... For some threatened and endangered species, a site survey at the level conducted for this report may ... According to the Corps Manual, for areas not considered “problem areas” or “atypical situations”: ... LANDOWNER REPORTS THAT TURTLES ALSO USE A DAIRY WASTE POND NEARBY. NEELY RANCH. ... LAND OUTSIDE OF SEWAGE PONDS IS PROTECTED BY CITY OF PETALUMA. ... NONE FOUND BY SHAFFER WITHIN 8 MI & NO REPORTS FOUND BY COOK. ..."

149 McNear Avenue Biological Assessment 2021

Matched in attachment: "... , if said reports and drawings are not bound herein. ... The CITY makes no representation as to the completeness of the reports or drawings referred to in Paragraph ... costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of reports of physical conditions ... If the CONTRACTOR fails to provide the City with an acceptable “Record Drawings”, the City shall deduct ..."

Matched in attachment: "... The CITY makes no representation as to the completeness of the reports or drawings referred to in Paragraph ... costs, operational characteristics, costs of training personnel, maintenance history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of reports of physical conditions ... Test Reports: 1. Submit reports of: a. Functional Checkout b. Performance Test c. ... Any problem areas or inadequacies in the equipment due to prospective short- circuit currents shall ..."

Close window