Search Results

Filters

1269 Results Found

Matched in attachment: "... �EADB���;BFlD@�d=@=BI=�Dd�kDAI=]�>DEBF]�kA>ADB�;BF�FACABJ9�0/�? ..."

Matched in attachment: "... River Bend Crossing TIS Clover Site 30du 9.52 286 0.75 23 6 17 1.00 30 19 11 Cedar Grove Site 83 du ... 9.52 790 0.75 62 15 47 1.00 83 52 31 Total 7 73 du 1,076 85 21 64 113 71 42 Proposed Riverbend ... Project 30 du 9.44 283 0.74 22 6 16 0.99 30 19 11 Note: du= dwelling unit Based on the updated trip ... = dwelling unit Units 18 du 6du 6 du Conclusions and Recommendations Rate Required 2 covered ... plus 2 additional uncovered spaces per du 1 covered and 1 uncovered space per du 1 covered and ..."

Matched in attachment: "... The project CC & R's (conditions, covenants and restrictions) shall be amended to add references regarding ... The project CC & R's (conditions, covenants anl:l restrictions) shall be amended to add references regarding ..."

Village East OCR

Matched in attachment: "... Stephen is also the creator of our popular See Saws and was able to add to the intricate images of the ... With sponsorship money we saved from other areas, we were able to add this piece to the event. ... Also, in our original proposal we neglected to consider the increased need for security due to our added ..."

Matched in attachment: "... item of the WORK by an amount up to and including 25 percent of any Bid item in its entirety, or to add ... Subtotal MISCELLANEOUS 1 370.00 LF 2 896.00 LF 3 294.00 LF 4 6.00 Each 5 1.00 Each Asphalt Paving ADA ... A labor surcharge will be added to the cost of labor described herein accordance with the provisions ... No additional mark-ups and/or surcharges will be added to the cost. ... The pedestrian path shall be clear of any debris and meet ADA requirements. ..."

Matched in attachment: "... throughg 07/ 31 /2017 Page of SEE INSTRUCTIONS ON REVERSE Add Lines 6 + 7 $ 9. ... Add Lines 1 + 2 $ $ Received $ $ 4. ... Add Lines 6 + 7 $ 9. ... Add Lines 6 + 9 + 10 $ Current Cash Statement 12. ... Add Line 2 + Line 9 in Column B above $ 6285.43 6285.43 To calculate Column B, add amounts in Column ..."

Matched in attachment: "... No additional mark-ups and/or surcharges will be added to the cost. ... The City reserves the right to add or delete any identified work. ... No markup shall be added for overhead and profit. 3) The time for which such compensation will ... The pedestrian path shall be clear of any debris and meet ADA requirements. ... Add sufficient water to form a damp formable consistency. Non-Shrink Grout. ..."

Matched in attachment: "... en una póliza de ocurrencia) Daños a las instalaciones alquiladas: $100,000 Lesiones personales y ADV ... De conformidad con la Ley de Estadounidenses con Discapacidades de 1990 (ADA, por sus siglas en inglés ..."

Matched in attachment: "... What is planned expansion of the Facility that would add electrical load? ... We have added a response question to the RFP document. ..."

Close window