Matched in attachment:
"... 3
4
" CHAMFER (TYP)
8'-2"
17'-3"
2'
2'
1'
WET WELL CENTER
LINE, PARALLEL TO
VALVE VAULT
ADD... SHEET 9
2 #5 EDGE BAR AT
TOP ALL AROUND
REBAR MATE #5 AT 12" OC EACH WAY, FOR
10" SLAB OVER WETWELL ADD... , HOOK TOP BARS, BOTTOM BARS
ARE STRAIGHT (TYP)
NOTE: ADDITIONAL REBAR AT CORNERS AND EDGES TO BE ADDED ..."
Matched in attachment:
"... .:
5.1498.00
W:\AD-NOV\WP\5\5149800\Reports\Hydrology\2018-11-30 PrelimHydrology (5.1498.00 ... CSW|ST2 File No.:
5.1498.00
Preliminary Hydrology Study
November 30, 2018
W:\AD-NOV ... – Post�Project Conditions
Preliminary Hydrology Study
November 30, 2018
W:\AD-NOV ... The
Preliminary Hydrology Study
November 30, 2018
W:\AD-NOV\WP\5\5149800\Reports ... Preliminary Hydrology Study
November 30, 2018
W:\AD-NOV\WP\5\5149800\Reports\Hydrology ..."
Matched in attachment:
"... ADA GUIDELINES
As an instructor for the City of Petaluma, I welcome persons with
disabilities to participate ... I understand and agree to the above ADA guidelines and certify that
the above information is true to ..."
Matched in attachment:
"... Alignment
Waters and Inlet Ruderal Area - Wetlands Could be Present
Drainage and Wetlands
PETALUMA R AD... pallid bat
California red-legged frog
foothill yellow-legged frog
western pond turtle
PETALUMA R
AD... will likely generate a large volume of water and
temporary dewatering and groundwater disposal can add ..."
Matched in attachment:
"... California Oak Woodland Statute
In September 2004, State Bill 1334 was passed and added to the State ... The River Plan adds requirements to the development of properties to improve their relationship to the ... Between 1954 and
1973, several outbuildings were added. ... AB 52 adds "tribal cultural resources" to the specific cultural
resources protected under CEQA, and ... Scale (not to scale)
Printable Version Add to Shopping Cart
Project Site
Chapter 8: Geology ..."
Matched in attachment:
"... met; when ownership of a portion of the project is sold to a different entity; or when
new acreage is added... X
EC-16 Non-Vegetative
Stabilization 2 X
1) BMP fact sheet updated
in 2009
2) New BMP fact sheet
added... Socks
and Berms 2 X
SE-14 Biofilter Bags 2 X
1) BMP fact sheet updated
in 2009
2) New BMP fact sheet
added... PLANS, PIPE MATERIALS SHALL BE THE
FOLLOWING:
SANITARY SEWER - FORCE MAIN: DR-11
STORM DRAIN - HDPE ADS ..."
Matched in attachment:
"... population, including employees of new commercial
development, as new residents and employees are added... population, including employees
of new commercial development, as new residents and
employees are added ..."