Matched in attachment:
"... The CITY makes no representation as to the completeness of the reports or
drawings referred to in Paragraph ... costs,
operational characteristics, costs of training personnel, maintenance
history, warranties, problems ... The CITY will identify and make available to the CONTRACTOR copies of
reports of physical conditions ... If the CONTRACTOR fails to provide the City with an
acceptable “Record Drawings”, the City shall deduct ... Minimum gluing will only be permitted to repair problem areas, corner completions,
and to cut in any ..."