Search Results

Filters

5746 Results Found

Learn about the Rivertrail - 101 Crossing project within the City of Petaluma. The City applied and is waiting to hear if Prop 68 will be awarded.

Petaluma requires business safety inspections before issuing business license. Learn what this involves and how to schedule one.

Road safety improvements in Petaluma in design include the installation of approximately 150 feet of guardrail along Petaluma Boulevard South near Gossage Avenue; traffic signal head replacement at 12 intersections; and the installation of rectangular rapid flashing beacons at 12 uncontrolled crosswalks.

Learn about the Transit Center Improvements project in the design phase in Petaluma, Calif. The project will improve improved pedestrian access and safety at the Petaluma Transit Center.

Learn about the Rainier Crosstown Connector project in Petaluma, Calif. This project (in the design phase currently) includes the construction of the Rainier Crosstown Connector that will connect McDowell Boulevard at Rainier Avenue to Petaluma Boulevard North.

Learn about the pavement restoration of of Maria Drive from Sonoma Mountain Parkway to Rainier Avenue in Petaluma, Calif. The work will include new curb ramps, installation of a recycled waterline to be used in the future, paving and restriping.

Learn about the Denman Reach Phase 4 flood mitigation project within the City of Petaluma. Scheduled for completion in 2020.

Click here to access links to the 2019 Monthly Reports for the City of Petaluma.

The City of Petaluma publishes a summary of its activities on a monthly and annual basis. Click here to access these reports in .pdf format.

Close window