Westridge Trail

Project Description 

The Westridge Trial is comprised of two trails surrounding the drainage channel in the Westridge neighborhood. There are several access points from the neighborhoods, and a community garden and playground that are supported by this trail. The trail has a mix of degraded asphaltic concrete and unimproved dirt conditions. The project will resurface the trail with new asphalt.

Project Location 

Westridge Trail. 

Traffic Impacts & Benefits  

During construction traffic control measures will be in place to manage traffic flow in the area as well as protect the work areas. Parking along the streets may be impacted to ensure traffic flow through the area is maintained. Access to driveways and properties will be preserved at all times throughout the project. The City will make every effort possible to minimize traffic impacts to businesses/residents; however, please plan for some delays in the area and travel carefully through the work zone.

Timeline/Project Status  

Construction started mid April 2022 and was completed in June 2022.

Funding

The project is funded through Measure M.

Bid Details

The project was awarded to Pat Nelson Construction, Inc.

Picture of Westridge Trail
Close window